Metallic Constructions
Gare de Mons
2023
Mons,Belgium
Infrastructures
Gare de Mons
Client
Eurogare
Developer
SNCB - Société Nationale des Chemins de fer Belges
Architecture
Santiago Calatrava
Weight
3,000 t + 600 t of metallic structure
Scope
The works include the supply and assembly of approximately 3,000 tonnes of metallic structure, the assembly of 600 tonnes of structure previously produced and stored on-site, as well as other work associated with the dismantling of temporary structures.
Share project on
The architectural and conceptual line of the project, Santiago Calatrava's brand image, confers the project high levels of requirements and complexity. The project to modernise the station has been underway since 2004, and all the work will be carried out with the partial operation of the station, which is an increased logistic and assembly challenge.